Project No.19
Menaiktaraf Loji Rawatan Air Jeniang Baru Sik, Kedah
The works for the proposed Jeniang Baru 2 WTP 35 MLd plant shall comprise the following:
- Intake and raw water pumping station
- One (1) aerator cum mixing chamber
- Four (4) clarifiers consisting of coagulation, flocculation and horizontal sedimentary tanks
- Eight (8) filters and filter gallery & Process Control Building
- One (1) chlorine contact cum clear water tank, one (1) backwash water tank, one (1) Chemical Preparation Building & one (1) Chlorination Plant Building
- Approximately 11.6 km of Mild Steel pipes – with sizes ranging from 700mm ND to 300mm ND.
- M&E Works – including raw water & treated water pumping plant, surge suppression system, booster pumping plant, pumping system for filter backwash and waste washwater recovery, pumping and surge protection systems for the treated water pumping systems, all electrical systems for both high voltage and low voltage systems, instrumentation system, telemetry system, building services and testing, pre-commissioning, performance testing, and commissioning of the plant.